![]() |
Feedback...
Have any questions or concerns? Give us your feedback
|
Home > City Departments > Permit and Inspection Services > Inspections > Plumbing > Plumbing Permit Fees Plumbing Permit FeesPlumbing Permit fees are divided into two categories - flat fee or area-calculated fee; find the work description in either the FLAT FEE SCHEDULE or the AREA-CALCULATED FEE SCHEDULE, below. The following document is available for viewing in Portable Document Format (PDF) using Adobe Acrobat Reader. Click on icon for a free download. All Plumbing Flat Fee work is only work where no plans are required by the Building Code of New York State. When drawings and/or plans are required, fees are derived using the area-calculated fee tables, employing the building occupancy/use class multiplier. All other installations which are not subject to no-fee provision have area-calculated permit fees derived from Fee Schedule A and Use Multiplier Schedule B. Area-Calculated Building Permit fees consist of four charges - a charge associated with application (which is non-refundable), a charge associated plan review (which is non-refundable), a charge associated with inspections, and a charge associated with closeout. The first two charges are collected at application, and together make up the application fee. The second two charges are collected at permit issuance, and together make up the permit fee. FOR WORK LIMITED TO BUILDINGS & STRUCTURES
FOR WORK LIMITED TO SITES
FOR WORK ON BOTH BUILDINGS & STRUCTURES AND SITES
The following documents are available for viewing in Portable Document Format (PDF) using Adobe Acrobat Reader. Click on icon for a free download. |
|
© 2001-2011 City of Buffalo Photos by Angel Art LTP, compliments of the Greater Buffalo Convention and Visitors Bureau. Additional photos by Adrian Roselli, compliments of Algonquin Studios. Additional Photos by Christina Cooke. Feedback | Accessibility Statement | Disclaimer and Privacy Policy | Site Map |